BOM Accuracy Validator
br-bom-validator
Writes to Oracle EBS, after confirmation in Excel
Validate Oracle EBS bill-of-material accuracy against how the shop floor actually consumes material: compare BOM structures with WIP component requirements and shortages, flag suspect components (never issued, always short, quantity drift), and stage approved BOM corrections via the BOM Bill of Materials Upload — only on explicit user confirmation.
When to use
Use when the user asks whether BOMs are accurate, why jobs are always short the same part, or wants BOM cleanup done. Recommend-first; WRITES to Oracle EBS only via the gated correction step.
Install
Claude in Excel: upload the zip under Customize > Skills > Create skill. Microsoft 365 Copilot in Excel: copy the skill folder into Documents/Copilot/Microsoft Excel/Skills in your OneDrive. Or install blitz-report-excel-addin-ai-skills in Claude Code and run /blitz-report-excel-addin-ai-skills:excel-skills-setup.
Requires Blitz Report and the Blitz Report Excel add-in, connected to your Oracle EBS instance.
Blitz Reports used
Skill contents
SKILL.md
# BOM Accuracy Validator (br-bom-validator)
> 🚨 **Blitz data = Excel worksheet UDFs, not MCP tools/connectors.** Extract data only by writing `=br_...()` into a cell (via `execute_office_js`) and reading the spill — **never** `tool_search` for `br_*`, **never** `refresh_mcp_connectors`, and never conclude "no Oracle EBS / Blitz connector is set up" (the Blitz Report add-in is an Excel add-in, not an MCP connector, so it never appears in the connector list — its absence there is expected). Load the extraction mechanism first: `read_skill("br-run-reports")`.
> **Performance:** read `br-analytics-standards` at the start of every run. For the correction step,
> **read `br-run-uploads` FIRST**.
## When to use
"Are our BOMs accurate", "why is every job short part X", "clean up the BOM for assembly Y",
"which BOM components are dead". For job-level health and WIP value use
**br-wip-variance-analysis**; this skill judges the BILL, using the jobs as evidence.
## Inputs
- **Organization Code** (required) — ask if not supplied.
- **Assembly scope** — an assembly, a range, or org-wide (warn on org-wide size; narrow if the user
can).
- **Evidence window** — default 12 months of WIP history; say so.
## Reports and uploads used (authoritative names — do NOT broad-search for them)
| Name | Type | Role |
|---|---|---|
| `BOM Bill of Material Structure` | Report | the bills as defined — components, quantities, yields, effectivity |
| `WIP Required Components` | Report | what jobs actually required/issued per component |
| `WIP Discrete Job Shortage` | Report | recurring shortages — the "bill says X, floor needs more" signal |
| `WIP Component Report` | Report | issue detail cross-check on suspect components |
| `BOM Bill of Materials Upload` | Upload | **write path** for approved corrections |
Pass the exact names; fall back to a search only on `#BLITZ_REPORT_NOT_FOUND`.
Engineering-change (ECN) impact is out of scope — no ECN report ships; say so if asked.
## Workflow
1. **Extract** the BOM structures for the scope and the WIP evidence for the window (one call per
report).
2. **Score each BOM component** against the evidence:
- **DEAD** — on the bill, never required/issued by any job in the window (candidate to remove or
end-date).
- **UNDER-QUANTITY** — jobs consistently issue/require more than the bill quantity, or the part
recurs on shortages across jobs (candidate to raise qty or fix yield).
- **OVER-QUANTITY** — jobs consistently consume less (candidate to lower qty; scrap-factor
suspects called out).
- **OFF-BOM USAGE** — components jobs issue that are NOT on the bill (candidate to add).
- **OK** — evidence matches the bill.
Every non-OK class carries its evidence inline: jobs counted, average actual vs bill quantity.
3. **Rank** by financial effect (quantity drift × component cost × annual build volume) so the
cleanup list starts where it pays.
4. **Deliverable**: per-assembly validation sheet + the ranked correction candidates + dashboard
(br-data-dashboard).
5. **Correct (optional, gated)**: only for corrections the user explicitly approves — download the
`BOM Bill of Materials Upload` for the assemblies, apply ONLY the approved changes (quantity
updates, end-dates, additions), validate, show assembly/component count and before/after values,
submit on a second explicit confirmation. Remind the user a changed bill affects future jobs
and cost rollups — existing jobs keep their snapshots.
## Hard rules
- Evidence below a minimum job count (default 5 jobs — CONFIG, label it) → the component is
INSUFFICIENT-EVIDENCE, never a candidate.
- Alternate/option-class structures: validate only the standard bill unless the user names an
alternate; say which bill was judged.
- Never propose removing a component that appears on open jobs' requirements.
## Degradation rules
- No WIP history for an assembly (never built in the window) → the bill is UNVERIFIABLE, listed
separately — absence of evidence is not accuracy.
## Talk in the user's language
Assemblies, components, quantities, jobs — never `br_*` functions or helper sheets.